When to fence in Sunraysia: heat, fire bans and harvest

What the Total Fire Ban sources say about grinding and welding, what Mildura's climate means look like, and why harvest is a question about access to the block. No calendar is published, because no reliable one was found.

Total Fire Ban fencing work: what the Victorian sources say

On the Victorian side of the Murray, two CFA documents we found bear on fencing-type work, and both are old. A CFA news item dated 20 October 2015 said that for the Mallee district the use of angle grinders and welding equipment in the open was also prohibited on a day of Total Fire Ban, and that machinery working in paddocks must carry firefighting equipment (CFA news item). The CFA brochure "Can I or can't I?", updated September 2014 and covering Victoria only, says welding, grinding, charring, soldering or gas cutting are banned on Total Fire Ban days without special permits (CFA brochure). It adds that in the Fire Danger Period, grinding or welding needs a fire-resistant shield or guard, and machinery must be free from faults that could cause a fire.

Because both documents are old, check current CFA rules before any work. On the New South Wales side of the Murray, we found no Rural Fire Service statement, so we say nothing about its rules: ask the RFS. Ask the contractor which parts of your job involve grinding or welding in the open, and what happens to the booking if a Total Fire Ban is declared.

Is there a best time to build a fence in summer? The sources do not say

We found no source that names a best month for rural fencing around Mildura, so we do not. What the Bureau of Meteorology does give is the climate: monthly means for the Mildura Airport station (076031, records from 1946 to 2026). They describe the district, and they do not say when fencing is best. The airport is at Mildura. It is not Robinvale, Ouyen or Wentworth, and we did not fetch climate figures for those towns.

MonthMean maximum (C)MonthMean maximum (C)
January32.6July15.5
February31.9August17.4
March28.6September20.8
April23.8October24.3
May19.2November27.7
June16.0December30.5

The annual mean maximum is 24.0 C. The mean minimum is 16.9 C in January and 4.4 C in July (Bureau of Meteorology). Mean annual rainfall is 285.8 mm, and the monthly means run from 19.3 mm in April to 29.4 mm in October, so there is no wet season. We do not give days over 40 C or any record temperature, because the page we fetched does not. Ask the contractor how heat shapes their working day and their booking calendar.

A fence line at sunrise in summer with heat haze over dry grass, a ute parked on the track, and table grape vines with harvest bins on a trailer beyond the fence, no people
Sunraysia district. A summer fence line with a harvest block beyond it

Flash floods and storms

Rain is low and spread evenly through the months, but short intense falls cause flash flooding. Victoria SES says the last significant riverine flood event at Mildura occurred in 1956, that levees and planning have reduced riverine risk, and that flash flooding is the higher risk, giving February 2011 as an example, when 108 mm fell in 4 hours (Victoria SES). It also says there are no Local Flood Guides for Mildura Rural City. The source gives no flood season, so we publish none. For the permit side of building near the river or in a flood area, see the Murray page.

Ask the contractor how harvest and pruning affect access to the block.

Harvest and pruning: a question about access

Harvest changes who and what is on a vineyard or orchard block. A regional horticulture workforce page (Greater Sunraysia workforce hub) gives workforce numbers of 8,000 to 14,000 for the table grape peak and names no months. News items about the dried fruit season and the table grape peak describe seasonal timing, but their dates are unverified, so we publish no harvest calendar. We also found no pruning calendar.

The practical question is access. A fence along a vineyard boundary may sit beside harvest bins, trailers and people on the track, so ask the contractor how harvest and pruning affect access to the block, and tell them any dates when your own crews need the track clear. The vineyard, orchard and boundary fencing page covers boundaries, gates and channel or river edges.

Irrigation channel works

Lower Murray Water's Sunraysia Water Efficiency Project fact sheet (irrigation channel works) describes channel lining and some replacement with buried pipelines, with works mostly in winter and access arrangements negotiated with landholders. The fact sheets say nothing about fences or channel reserve boundaries, so any rule about fencing a channel is a gap in our sources. If your fence meets a channel, ask Lower Murray Water.

Questions to ask about timing

  1. What is the plan on a Total Fire Ban day? Ask how the booking moves if grinding or welding in the open is restricted.
  2. Which tasks involve grinding or welding? And what shield, guard or equipment is carried.
  3. How do harvest and pruning affect access? Tell the contractor any dates when the track must stay clear.
  4. Which side of the Murray is the fence on? Check current CFA rules for Victoria, or ask the RFS in New South Wales.
  5. Is there a rain or flood trigger? Ask how the contractor handles a forecast storm.

How timing feeds into a quote is covered in the cost and quote guide, and the farm and stock fencing page covers the jobs themselves. When you are ready, send your town, the side of the Murray and your preferred dates.

What this guide cannot do

This guide cannot tell you when to fence, or whether a given day is a Total Fire Ban day. The CFA documents we found are old, and we have no Rural Fire Service statement for the New South Wales side of the Murray, so you must check current rules with the CFA, the RFS and the contractor. The climate figures describe Mildura Airport and not your block. We found no harvest or pruning calendar and publish none. We are a referral service: we pass your enquiry to local contractors, who decide when and how the work is done.

Written November 2026

Check the current rules before you rely on this

This page describes the climate means, Total Fire Ban sources and harvest access questions that bear on the timing of rural fencing around Mildura. It describes the rules in general terms as they stood in November 2026. Standards, forms, thresholds and fines change.

The authoritative sources are Bureau of Meteorology, Mildura Airport climate statistics (station 076031), CFA, total fire ban in Mallee (news item, 20 October 2015; old, check current rules), CFA, Can I or can't I? brochure (September 2014; Victoria only, check current rules), Victoria SES, flood guide: Mildura Rural City Council and Horticulture Innovation Network, Greater Sunraysia region seasonal workforce hub. Where anything here differs from those sources, they are right and we are not.

We are not fencing contractors, builders, regulators or lawyers. For what applies to your fence, ask the contractor which licence or registration they hold, then ask the regulator for the side of the Murray where the fence is: Building Commission NSW (13 27 00) for New South Wales, the Building and Plumbing Commission for Victoria.

Accurate at the time of writing, November 2026. Always check the source before relying on it.

Questions

Common questions

What does the CFA say about grinding and welding on a Total Fire Ban day?

On the Victorian side of the Murray, a 2015 CFA item for the Mallee said angle grinders and welding equipment in the open were prohibited on a Total Fire Ban day, and a 2014 brochure said welding and grinding are banned without special permits. Both are old, so check current CFA rules.

What fire rules apply to fencing work on the New South Wales side of the Murray?

We found no Rural Fire Service statement, so we say nothing about its rules. Ask the RFS, and ask the contractor how a fire ban would affect your booking. Do not rely on the Victorian documents, which apply to Victoria only.

Does grinding or welding need a shield outside a Total Fire Ban?

The 2014 CFA brochure says that in the Fire Danger Period, grinding or welding needs a fire-resistant shield or guard, and machinery must be free from faults that could cause a fire. It covers Victoria only and is old, so check current CFA rules.

How hot does Mildura get in summer?

The Bureau of Meteorology's Mildura Airport station gives a mean maximum of 32.6 C in January and 31.9 C in February, and a mean minimum of 16.9 C in January. These are means, not records, and the airport is not your block. Ask the contractor how heat affects their working day.

Does Mildura have a wet season?

No. Mean annual rainfall at Mildura Airport is 285.8 mm, and the monthly means run from 19.3 mm in April to 29.4 mm in October. Short intense falls cause flash flooding, such as 108 mm in 4 hours in February 2011, according to Victoria SES.

Does the Murray flood affect when I can build a fence?

Victoria SES says the last significant riverine flood at Mildura was in 1956 and flash flooding is the higher risk. It gives no flood season. Near the river or a flood area, permits may matter more than the calendar: see our Murray page and ask the council.

When is the harvest, and will it block access to my fence line?

We publish no harvest calendar, because the sources give workforce numbers and no reliable months. Ask the contractor how harvest and pruning affect access to the block, and tell them any dates when your own crews need the track clear.

Do irrigation channel works affect fence timing?

Lower Murray Water's fact sheet describes channel works as mostly in winter, with access arrangements negotiated with landholders. It says nothing about fences or channel reserves. If your fence meets a channel, ask Lower Murray Water before you book the work.

Next step

Send a photo of the fence line and a town

The town, which side of the Murray, the fence type, roughly how long it is and how it is reached. That is usually enough for a contractor to ask the right questions before a visit.